EasyManua.ls Logo

IBM Selectric - Preventive Maintenance

IBM Selectric
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22.1
SPRING
SCALE
- ZERO CALIBRATION
Many adjustments made
in.
the
field require
the
use of
spring
scale,
PN
9900012.
Reports
indicate
that
the
accuracy
of
the
scale
is impaired due
to
the
zero
ad-
justment being
incorrect
before measurements
are
made.
The
zero
adjustment
can
be made by removing
the
two screws
that
fasten
the
end
cap
I
and
removing
the
end
cap.
This exposes an
adjustable
collar
se-
cured
by a #4 Allen
screw.
The
zero
adjustment
can
be made by· loosening
the
Allen screw
and
reposition-
i ng
the
co
liar
on its
shaft.
The hook may have
to
be
removed from
the
sca
Ie
to
a Ilow
the
shaft
to
move far
enough to expose
the
Allen screw; however I
the
hook
shou
Id
be rep laced when
checki
n9
the
zero
adj ustment .
Correct
adjustment is
checked
by holding
the
scale
in
the
upright position (hook hanging down) and
observ-
i
ng
that
the
sca
Ie
reads
exact
Iy
O.
__
----
Allen Set Screw
Figure
22.0
PREVENTIVE
MAINTENANCE
23.0
Preventive
Maintenance
For
complete
PM
procedures
see
the
Reference
Man-
ual
#225-1726
(Keyboard)
and
#255-3207
(Keyboard-
less). The following method of IIcycle
ll
inspection is
recommended. The
I/O
Pri
nter
shou
Id
be
PM'd four
times a
year
for sing
Ie
shift
operation.
The frequency
should
be
increased
in
direct
proportion
to
shift
usage.
Each inspection should
include
a
complete
lubrication
as
outlined
in
the
Reference
Manual.
Each inspection
should
cover
a
different
area
of
mechanical
check
and
adjustment.
1st Inspection
--
Cycle
Clutch,
Tilt Mechanism,
Ribbon Mechanism
2nd
Inspection
--
Keyboard
Area,
Rotate Mechanism,
Detenting
3rd Inspection
--
Scoping - Print
Magnets,
Oper-
ational
Magnets,
Contacts
4th Inspection
--
Operational
Area
5·28
23.1
The following items require
special
attention:
a . Motor
and
Motor
Pu
Iley .
b.
Cycle
Clutch
Spring and Arbor.
c.
Driven
pulley
hub
and
bearing.
d.
Operational
Cam Bearing.s.
e.
Operational
Shaft
and
Shift Cam Bearings.
f.
Shift
Clutch
Spring
and
Arbor.
These items should
be
lubricated
every
8 weeks for
shift
usage.
23.2
LUBRICATION
Two
new lubri
cants
have
been re leased
to
rep
lace
a
II
present lubricants for
the
SELECTRIC
I/O
Printer.
The first new lubricant is
IBM
#23.
This
wi
II
be
sup-
plied
in
1/2
ounce
tubes
and
in 1
lb.
cans.
It
should
be
used
wherever
Si
I-X or a
grease
was previously
recommended.
In
most cases
the
IBM
#23 in
the
1
lb.
can
should
be
used in
conjunction
with
the
grease
gun,
PN
158645,
and
the
special
nozzle,
PN
450813.
Don't
forget
to
use this
special
nozzle
on
the
cycle
clutch
grease
hole
located
between
the
negative
5
cam
and
the
RH
positive
cam.
The
second
new
lubricant,
IBM
#
10,
shou
Id
be
used
wherever
an
ET
#6
or
IBM
#9 oi I was previously
spec-
ified.
The new
IBM
#10 oi I
can
be
identified
by a red
cap
on
the
cam.
The new
IBM
#23
grease
can
be
identified
by
the
cap
on
the
1/2
oz.
tube
and
the
one
pound
can
wi
II
be
clearly
marked
IBM
#23.
Machines with high shift usage require more frequent
lubrication
than
machines used for
single
shift
oper-
ation.
The following
areas
are
primari
Iy
affected
by
&idling time I
since
only
the
operational
shaft is
driven.
1.
Motor
and
motor pu Iley .
2.
Cycle
clutch
spring and
arbor.
3.
Driven pu Iley hub
and
beari
ng
. *
4.
Operational
cam
bearings.
5.
RHoperational
shaft
and
shift cam
bearing.
6.
Shift
clutch
arbor
and
spring.
When power is on
24
hours
dai
Iy, we recommend
lubri
cation
of
items 1 thru 6
every
eight
weeks.
Note:
Lubrication must
be
applied
judiciously
to
eliminate
migration
or
IIspin-offll
into
electrical
con-
tact
areas.
IBM
No.
Part
No.
Description
23
1280441
1/2
oz.
tube
-
IBM
#23
23 1280442
1
lb.
can
-
IBM
#23
10 1280443 4
oz
.
can
-
IBM
#10
10
1280444 1
pt.
can
-
IBM
#10
The
above
part
numbers
are
avai
lable
in
Mechanics-
burg,
and
a
II
EPC's.
*
See
S . H.
15.7

Table of Contents

Other manuals for IBM Selectric

Related product manuals