EasyManua.ls Logo

IBM Storwize V7000 Gen2 - Enclosure; Canister; Steps for Different Installation Scenarios

IBM Storwize V7000 Gen2
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 5. Steps for different installation scenarios
New system (control
enclosure only)
New system (control
enclosure and one or
more expansion
enclosures)
Adding expansion
enclosures to an
existing system
Adding control
enclosures and
expansion enclosures
to an existing system
“Reviewing your
packing slip” on
page 5
“Reviewing your
packing slip” on
page 5
“Reviewing your
packing slip” on
page 5
“Reviewing your
packing slip” on
page 5
“Identifying the
hardware
components” on page
6
“Identifying the
hardware
components” on page
6
“Identifying the
hardware
components” on page
6
“Identifying the
hardware
components” on page
6
“Verifying
environmental
requirements” on
page 9
“Verifying
environmental
requirements” on
page 9
“Verifying
environmental
requirements” on
page 9
“Verifying
environmental
requirements” on
page 9
“Reviewing enclosure
location guidelines”
on page 9
“Reviewing enclosure
location guidelines”
on page 9
“Reviewing enclosure
location guidelines”
on page 9
“Reviewing enclosure
location guidelines”
on page 9
“Installing support
rails for the control
enclosure” on page
11
“Installing
support rails for
the control
enclosure” on
page 11
“Installing
support rails for
expansion
enclosures” on
page 15
“Installing support
rails for expansion
enclosures” on page
15
1
“Installing
support rails for
the control
enclosure” on
page 11
“Installing
support rails for
expansion
enclosures” on
page 15
2
“Installing the
enclosures” on page
19
“Installing the
enclosures” on page
19
“Installing the
enclosures” on page
19
1
“Installing the
enclosures” on page
19
2
“Connecting Ethernet
cables to node
canisters” on page 24
“Connecting SAS
cables to expansion
enclosures” on page
21
“Connecting SAS
cables to expansion
enclosures” on page
21
1
“Connecting SAS
cables to expansion
enclosures” on page
21
1
“Connecting Fibre
Channel cables to
a 10 Gbps
iSCSI-FCoE 4-port
host interface
card” on page 25
“Connecting Ethernet
cables to node
canisters” on page 24
“Powering on the
system” on page 27
1
“Connecting Ethernet
cables to node
canisters” on page
24
2
“Powering on the
system” on page 27
“Connecting Ethernet
cables to node
canisters” on page 24
“Adding an
expansion enclosure
to an existing
system” on page 33
Chapter 3,
“Configuring the
system,” on page 29
“Powering on the
system” on page 27
“Powering on the
system” on page 27
Chapter 3,
“Configuring the
system,” on page 29
“Adding a control
enclosure to an
existing system” on
page 33
2 Storwize V7000 Gen2: Quick Installation Guide

Table of Contents

Related product manuals