19
STZSkW ed 12/07 ZEUS Superior kW
Technical Documentation
Technical Documentation
Ø 80/80 push-t twin pipe ue kit.
Both pipes have an 80 mm diameter.
Boiler connections are obtained by means of two anges,
discharging ue (4) through the central tting and taking air
in (3) from one of the two side holes.
e maximum allowed length (air + ue) is 33 straight hori-
zontal meters and 41 straight vertical meters.
In order to avoid condensate problems, ue duct length is to
be limited to 5 meters.
Ø 80/80 push-t insulated twin pipe ue kit.
e functional diameter is 80 mm for both pipes.
Boiler connections are obtained by means of two anges,
discharging ue (4) through the central tting and taking air
in (3) from one of the two side holes.
Tightness is ensured by special gaskets (6); they create an air
space with the external Ø 125 mm concentric pipe.
Maximum allowed length is 33 straight meters (air + ue).
In order to avoid problems with condensate, ue duct length
is to be limited to 12 meters.
Ø 80/125 push-t vertical concentric kit.
e ue duct (Ø 80 mm) is inserted in the intake duct (Ø
125 mm).
Connect to the boiler using a flange (2). Using the
60/100-80/125 adapter (3) and the appropriate extensions,
connect to the 80/125 air and ue terminal with an aluminum
tile (6).
Maximum allowed length is 12.2 straight vertical me ters.
Ø 60/100 push-t vertical terminal kit.
e ue duct (Ø 60 mm) is inserted directly in the intake
duct (Ø 100 mm).
Connect to the boiler using a ange (2). Using the appropriate
extensions, connect to the 60/100 air and ue terminal with an
aluminum tile. e maximum length allowed is 4.7 straight
vertical meters.