EasyManua.ls Logo

IMO Oko 2000 - Step of Drying; End of Program

IMO Oko 2000
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IMO GmbH Gässlesweg 6 D-75334 Straubenhardt Tel.: 070 82 491 80 Fax: 604 36 www.imo-ag.com info@imo-ag.com
20
GmbH
5.3 Step of drying
5.4 End of program
Air is heated:
The updated air temperature and the target temperature
is indicated.
Drying step runs:
After reaching of the target temperature beam of humidity
get shorter by proceeding of dryness..
Required dryness is reached, afterward drying runs.
In case of an after drying time appointed (duration higher than 0)
this time runs with reduced capacity of turbine.
The exhausted time and the adjusted duration are indicate.
Phase of cooling down:
The internal space is cooling down to 50°C.
Turbine runs with reduced capacity.
End of program.
Provided, that report is activate in Setup, it will be printed.
By opening the door or entering of -key the equipment
switched of.
I
0
temp.: 58°C / 90°C
humidity:
duration: ---min./30min.
programme no. 2
drying
temp.: 90°C / 90°C
humidity: +++++
duration: ---min./30min.
programme no. 2
drying
temp.: 90°C / 90°C
humidity:
duration: 12min./ 30min.
programme no. 2
drying
temp.: 54°C / 90°C
humidity:
duration 30min./ 30min.
programme no. 2
programme
finished
drying