EasyManua.ls Logo

Infortrend EonStor GS 3000 Series - Installation Procedure

Infortrend EonStor GS 3000 Series
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
128
Installation Procedure
1. The installation begins with determining the installation position and M5 cage nut (5)
insertion location.
3/4U, M5 cage nut position
Front rack posts
Unit boundary
Unit boundary
05
2U, M5 cage nut position
05
Rear rack posts
M5 x 9.0mm
04
2. Install the fixed rack ear mount to the rear posts and secure them using truss head
screws (4)

Table of Contents

Related product manuals