EasyManua.ls Logo

Inovance MD310 T5.5B - Grid System Connection Requirements

Inovance MD310 T5.5B
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Wiring
- 8 -
For the MD310T7.5B to MD310T18.5B, remove the No.2 EMC screw, as shown in the following gure.
Figure 2-2 EMC screw position
VDR screw
EMC screw
1
2
Note
The screw is connected by default�
The screw cannot be re-connected once it is cut� This will result in an increase in leakage current to ground during drive running� Take
full consideration before cutting the jumper
2�5 Grid System Requirement
The drive is applicable to system with neutral point grounded� If the drive is used in an IT power system (neutral point not grounded),
remove both VDR and EMC screws for the MD310T0�4B to MD310T5�5B�
MD310
T3�7B and MD310T5�5B
For the MD310T7�5B to MD310T18�5B, it is necessary to remove the VDR and EMC screws, that is, No�1 screw and No�2 screw, as
shown in Figure 2-2� Filter cannot be installed� Otherwise, personal injury and damage to AC drive may result�

Table of Contents

Related product manuals