Installation
52
Before vertical hoisting, make sure that all components of the AC drive, including
the upper access cover and terminals, are fastened with screws. Failure to comply
may result in fall‑off of the AC drive, causing injury.
When hoisting the AC drive with a sling, protect the AC drive from excessive
vibration or impact. Failure to comply may result in fall‑off of the AC drive, causing
injury.
When hoisting the AC drive with a sling, do not overturn the AC drive or leave it
suspended for a long time. Failure to comply may result in fall‑off of the AC drive,
causing injury.
T1 to T9 models
To hoist T1 to T9 models, follow these steps:
1. Hook the sling to the two auxiliary eye bolts at the top of the AC drive.
Keep the hoisting angle greater than 45 degrees and the fluctuation within 0.3 m.
Figure 5‑12 Hoisting T1 to T9 models
2. Gradually tension the sling with the crane, and then hoist the AC drive.
3. Slowly lower the AC drive to an appropriate height and suspend it until it is stable.
Then, gently place the AC drive on the floor or mounting surface for installation in
the control cabinet.
T10 to T12 models
To hoist T10 to T12 models, follow these steps:
1. Hook the hoisting lug and eye bolt at the top and bottom of the AC drive, take out
the AC drive from the packing box, and lay it flat on the floor.