EasyManua.ls Logo

Inovance MD520 Series - Unpacking and Transportation; Package Check

Inovance MD520 Series
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
‑45‑
Model Recommended Fastener Tool
T10 and T11 M12 bolt, spring washer, and
flat washer
Socket wrench (#19 socket)
and socket wrench extension
bar (250 mm)
T12
M16 bolt, spring washer, and
flat washer
Socket wrench (#24 socket)
and socket wrench extension
bar (250 mm)
5.5 Unpacking and Transportation
5.5.1 Package Check
Upon receiving the AC drive from the transport company, check the items received
against the delivery note. Notify the transport company immediately in the case of
any missing or damaged items. If necessary, request support from Inovance or your
local agent.
Packing method and components vary with models due to difference in structural
dimensions and weight.
The electrical safety performance of the AC drive may be affected if it is damaged during
transportation. Avoid connecting the AC drive without a professional high‑voltage test on it.
Packing list for T1 to T9 models
T1 to T6 models are packed using cartons.
T7 to T9 models are packed using cartons and plywood pallets.
The following packing components are used:
Packing list for T1 to T6 models

Table of Contents

Other manuals for Inovance MD520 Series

Related product manuals