EasyManua.ls Logo

Inspire FPC1C - Step 3: Upright Beams Front Installation

Inspire FPC1C
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pg. 9 V1.0
STEP 3
UPRIGHT BEAMS FRONT INSTALLATION
Refer to the illustration above for location and orientation of components.
Fasten with Bolt (29) at the bottom, Washer (36), and Lock Nut (35). Connect Upright Beam (5) to the Bottom Base
Frame Assembly. Left side and Right side.
Repeat steps for the opposite side.

Related product manuals