e. Return to the main test screen to confirm the
changes by pressing .
i. LVDT position will be shown on this screen
if the Displacement channel is Enabled.
This can be verified by moving the LVDT
in/out.
ii. Load cell can be verified by pressing on
the load cell by hand to see if the load
changes.
f. Press to save changes. After 5 seconds,
press and return to the test screen to verify
changes.