EasyManua.ls Logo

Interlogix FP 2000 Series - 8.2 Procedure for Switching On

Interlogix FP 2000 Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
54 FP/FR1100/1200/2000 V6: Installation and Commissioning Manual
11. Investigate all devices that are reported Disabled.
12. Check all output relays for correct switching.
13. Configure your Panel ID.
IF A NETWORK IS INSTALLED:
1. Configure network set-up with one of two methods:
Manually using LCD menus.
Program by means of a laptop computer using the RS232 port.
2. Investigate all panel and repeater faults that are reported.
3. Check status of the systems on the ARCNET network that are configured to
communicate with the repeater. Faults regarding communication with repeater node
identification address should disappear when the ARCNET network is operational.
4. Check all connections to panels by emulating them.
5. Check panel fault reporting by switching the panel off.
6. Check fire and fault reporting.
7. Once all of the above is correct, then:
1. Switch the service switch to OFF
2. Check all network I/O for correct functioning
3. Switch the memory lock switch to locked
8. Reset the repeaters and panels.

Table of Contents

Related product manuals