Three-phase Grid-tied Solar Inverter Installation
13
4 Installation
This chapter introduces the installation of the inverter and the connection of the inverter to the PV
power generation system. Connecting inverters to PV power generation systems mainly involves the
PV strings and public grids connect to the inverter.
Please read this chapter carefully before installation, and ensure that all installation conditions are
met by professional technicians to complete the inverter installation.
4.1 Unpacking confirmation
The inverter has been thoroughly tested and rigorously checked before delivery, but damage may
still occur during transportation. Before unpacking, check carefully whether the product information in the
order is consistent with that on the nameplate of the package box and whether the product package is
intact. If any damage is detected, please contact the shipping company or the supplier directly. Please
also provide photos of the damage to get our fastest and best service.
When the inverter is left unused, please put it in the original packing box and take measures to
prevent moisture and dust.
Take out the inverter after unpacking, please check the following items:
(1) Confirm that the inverter host is complete and not damaged;
(2) Confirm that there are manuals, interface accessories and installation accessories in the packing
box;
(3) Confirm that there is no damage or shortage in the delivery content in the packing box;
(4) Check whether the order is consistent with the product information on the nameplate of the
inverter host;
(5) The standard delivery list is as follows.
Standard deliverables of three-phase inverter: