EasyManua.ls Logo

ITC DOSTEC AC - Page 3

ITC DOSTEC AC
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.4. Hydraulic installation 36
5.4.1. Installation examples 36
5.4.2. Installation recommendations 37
5.5. Accessories 38
5.5.1. Diaphragm leakage detector 38
5.5.2. Flow detector 38
5.5.3. Pressure sensor 38
5.5.4. Pulse output isolator 39
5.5.5. Additional ventilation 115 / 230 V 39
6. START-UP AND REGULATION 39
7. MAINTENANCE 40
7.1. Parts List AC3 Piston 40
7.2. Parts List AC3 DIAPHRAGM 44
7.3. Parts List AC 1/2 Piston 48
7.4. Parts List AC 1/2 Diaphragm 52
7.5. Periodic Maintenance 58
7.6. Troubleshooting: Possible cause and solution 59
7.7. Wiring 61
CE DECLARATION OF CONFORMITY 63
WARRANTY 63
To avoid personal injury risks and damage to the environment, and to ensure proper
equipment operation, personnel responsible for installing, commissioning and maintaining the
equipment must follow the instructions in this manual, with special attention to the detailed
recommendations and warnings. The specic instructions for the use of the chemicals to be
dosed must also be followed.
SAFETY INSTRUCTIONS