i
REVISION
REVISION
DATE
MADE
BY
APPLICABLE
ECN
DETAILS
A 01-19-2009 JC Process Initial release of manual.
B 01-30-2009 JC Process Added 15kW heater option and adjusted amperage ratings.
C 10-06-2009 RC N/A Added curtain installation diagram.
D 10-09-2009 ARL 8044
Changed the part from a weldment (05700-021-67-50) to a cast-
ing (09515-003-58-12).
E 12-01-2009 ARL
091125-1404-CW
Changed a dimension on page 30, the dimension between the
mounting holes was indicated as 2.00”, but should have been
2.88”.
F 10-29-2010 RLC
101029-1336-
CW
Updated Print for mounting Table Limit Switch
G 05-09-2012 RLC QOF 386
Added chart for cut lengths on 66,76,80 & 90 L-R drain plumb-
ing.
H 03-19-2013 RLC QOF NDB-219 Updated manufacturer information