Setup Electro Press JP Series 433
・Area Sensor (
Light Curtain) Installation
Connect to the I/O-S.
Install walls for
the guard.
Controller
(In this case, the walls
are transparent.)
In this case, the switchbox and light
curtain are installed using the steel
plates.
The switch box cord should be
inside the steel plate.
Light Curtain
Refer to the diagram on the left to create
equipment necessary for the safeguard.
M5 Screw
M4 Screw