EasyManua.ls Logo

jcb 214 - Power Sideshift Ram Removal and Replacement

jcb 214
890 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
40 - 1
Removal and Replacement
Removal
1 Park the machine on firm level ground, engage the
parking brake and set the transmission to neutral.
Lower the loader arms to the ground.
2 Position the carriage in the central protruding travel
position at 150 mm (6 in) from end of the rail, rest the
bucket on the ground and remove the starter key.
3 Operate control levers to vent hydraulic pressure.
4 Disconnect hydraulic hoses A and plug.
5 Disconnect all four chains at adjusters B and disengage
chains from ram pulleys.
6 Remove pin C from one end and support the ram.
7 Remove pin C from opposite end, withdraw ram.
Replacement
1 Locate the ram at one end with pin C. Adjust the ram
eye end so the the opposite end of the ram aligns with
mounting bracket.
2 Secure the opposite end of the ram in position with pin
C.
3 With a spanner on the rod end flats D adjust the rod so
that the ram eye end engagement is equal at each end
of the ram. Lock eye ends in position with nut E.
4 Reconnect the hydraulic hoses.
5 Locate the chains around the applicable ram pulleys.
Reconnect chains and adjust as required, refer to
Service Procedures, Power Sideshift - Chain
Adjustment.
Section B Body & Framework
9803/3280
Section B
40 - 1
Issue 1
Power Sideshift Ram
C
A
B
E
D
A326850
www.WorkshopManuals.co.uk
Purchased from www.WorkshopManuals.co.uk

Table of Contents

Related product manuals