EasyManua.ls Logo

Jerr-Dan MPL-40 - Page 76

Default Icon
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 4 : Operation
4-38 5376000277
8. Extend the wrecker boom and
adjust the wire rope cable(s) to
lift the top of the tow sling and
tow sling straps.
9. Lower the boom to allow the
tow sling head to raise out of it
holder on the back side of the
boom.
10. Carefully extend and lower the
wrecker boom to allow the tow
sling head to rotate outward
and down away from boom.
11. Lower the tow sling to the
ground.

Table of Contents

Related product manuals