EasyManua.ls Logo

Jetmaster 60i - Component Removal for Servicing

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Tertiary Air Tube Removal and V Board Bafe Removal and Retting
Tertiary Air Tube Removal and Lower V Board Bafe Removal and Retting
Upper V Board Bafe Removal and Retting
Remove the tertiary air tubes and V board bafes as detailed in appliance preparation on pages 14 and 15.
Once removed the tertiary air tubes should be cleared of any soot. Ensure all air holes are clear of soot and
debris. Clean all V board bafes and check condition.
If any boards show signs of surface damage or are broken then they should be replaced. Replacement parts are
available from your Jetmaster Distributor. For replacement of tertiary air tubes and bafes reverse the removal
procedure.
CAUTION
Ensure that the cam catch locator is positioned in the tube hole when the bolt is tightened to trap the tube from
sliding out and to ensure that the tertiary air ports are in their correct position within the re.
Ensure that the V board bafes are tted the correct way around.
30
Cam Catch
Upper V-board bafe
Lower V-board bafes
8mm bolt
Locator
Upper V-board bracket

Table of Contents

Other manuals for Jetmaster 60i

Related product manuals