EasyManua.ls Logo

JRC JCY-1800 - Page 173

JRC JCY-1800
197 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14. Maintenance Check List
JCY-1800/1850 VDR/S-VDR Installation Guide
163
DOC No. 7ZPJD0387C
VDR/S-VDR (JCY-1800/1850) INSTALLATION CHECKING LIST
Installation Dock Yard
Installation Ship Number & Ship Name
VDR / S-VDR Serial Number
MB
VDR or S-VDR
Installation Period
Installation Person company
Section
Name
General description of work
1) Please check installation operations, using this Checking-List. In the case of VDR/S-VDR installation operation.
2) Please fill in “v” mark the check space of carried-out operations.
3) Please draw a slant line the check space of the item of the unit not contained in composition.
4) Please write down the contents of operations, the modification operations space, as you carried-out the modification operations.
5) Send this Installation Checking list to the Marine service Department after installation.
6) Upload the Installation report file to the “Ship list” on the Marine service WEB.
(Refer to the 4.2 clause for details of Installation report file.)

Table of Contents

Other manuals for JRC JCY-1800

Related product manuals