Site Preparaon Checklist for EX4400 Switches
The checklist in Table 66 on page 115 summarizes the tasks you need to perform when preparing a site
for EX4400 switch installaon.
Table 66: Site Preparaon Checklist
Item or Task For More Informaon Performed by Date
Environment
Verify that environmental factors
such as temperature and humidity
do not exceed switch tolerances.
"Environmental Requirements and
Specicaons for EX4400
Switches" on page 118
Power
Measure the distance between
external power sources and the
switch installaon site.
"Clearance Requirements for
Hardware Maintenance for EX4400
Switches" on page 123
Locate sites to connect system
grounding.
Calculate the power consumpon
and requirements.
• "AC Power Supply in EX4400
Switches" on page 89
• "DC Power Supply in EX4400
Switches" on page 106
Hardware Conguraon
Choose the number and types of
switches you want to install.
"EX4400 Switches Hardware
Overview" on page 8
Rack or Cabinet
115