EasyManua.ls Logo

Juniper EX4400 - Page 124

Juniper EX4400
288 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 66: Site Preparaon Checklist
(Connued)
Item or Task For More Informaon Performed by Date
Verify that the rack or cabinet
meets the minimum requirements
for installing the switch.
"Rack Requirements" on page
121
"Cabinet Requirements" on page
122
Plan rack or cabinet locaon,
including required space
clearances.
Secure the rack or cabinet to the
oor and building structure.
Cables
116

Table of Contents

Related product manuals