4. Insert the at head 4x6-mm Phillips screws to aach the front mounng bracket assembly
(provided with the four-post rack mount kit) into the aligned holes on the chassis (see Figure 88 on
page 151). Tighten the screws.
Figure 88: Aach the Flush Mounng Bracket Assembly to the Switch
5. Decide which end of the switch you want to place at the front of the rack. Posion the switch so
that the AIR IN labels on the fan modules are next to the cold aisle and the AIR OUT labels on the
fan modules are next to the hot aisle.
6. Have one person grasp both sides of the switch, li the switch, and posion it in the rack, aligning
the holes of the mounng brackets with the threaded holes in the front post of the rack. Align the
boom hole in both the mounng brackets with a hole in each rack rail, making sure that the
chassis is level.
7. Have a second person secure the mounng brackets to the rack by using the screws appropriate for
your rack. Tighten the screws (see Figure 89 on page 151).
Figure 89: Secure the Switch to the Front Posts of a Rack
8. Slide the rear mounng bracket blades into the side rails of the front mounng bracket assembly
aached to the switch chassis (see Figure 90 on page 152).
9. Ensure that the chassis is level. Align the holes of the rear mounng brackets with the threaded
holes in the rear post of the rack. Align the boom hole in both the mounng brackets with a hole
in each rack rail. Align the boom hole in both the rear mounng brackets with the boom hole in
the front mounng brackets.
151