EasyManua.ls Logo

JVC GR-DVX8EG - Jigs and Tools Required for Disassembly, Assembly and Adjustment; Tools Required for Adjustments

JVC GR-DVX8EG
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-2
23
Guide Driver
YTU94148A
Tweezers
P-895
4
INF Adjustment Lens Holder
YTU94087
13 14 15
Gray Scale Chart
YTU94133A
Light box Assembly
YTU93096A
Color Bar Chart
YTU94133C
16
19 20
17
21 22
18
Torque Driver
YTU94088
5
Connector Extractor
YTU94036A
78
6
Bit
YTU94088-003
Slit Washer Installation Jig
YTU94121A
9
10
INF Adjustment Lens
YTU92001B
11 12
Camera Stand
YTU93079
Chip IC Replacement Jig
PTS40844-2
Jig Connector Cable
YTU93091B
Power Supply Jig
YTU94060A
PC Cable
QAM0099-002
Service Support System
YTU94057-48
Cleaning Cloth
KSMM-01
Soldering Kit
YTU96016C
Adjustment Driver
YTU94028
Alignment Tape
MC-2
1
Extension connector
YTU94145A
1.2 JIGS AND TOOLS REQUIRED FOR DISASSEMBLY, ASSEMBLY AND ADJUSTMENT
1.2.1 Tools required for adjustments
Table 1-2-1
1. Torque driver
Be sure to use to fastening the mechanism and exterior
parts because those parts must strictly be controlled for
tightening torque.
2. Bit
This bit is slightly longer than those set in conventional
torque drivers.
3. Tweezers
To be used for removing and installing parts and wires.
4. Chip IC replacement jig
To be used for adjustment of the camera system.
5. Connector extractor
To be used to release the connector.
6. Guide driver
To be used to turn the guide roller to adjustment of the
linarity of playback envelope.
7. Adjustment driver
To be used for adjustment.

Table of Contents

Related product manuals