Commissioning
If a capacitive value is displayed, or if the "G" symbol is ashing, the phase allocation of
the current and voltage measurement is incorrect. In the Commissioning programming
menu, the phase allocation can be changed using the functions Rot. eld U and Rot.
eld I (provided that there is no generator in operation at the time).
The rst switching operation may take up to 180 seconds. The stages are switched in set
intervals until compensation occurs. The displayed cos phi must increase to at least the
set target cos phi.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KBR multicomp F144-MS-1V1C1TI6RO-3 and is the answer not in the manual?

KBR multicomp F144-MS-1V1C1TI6RO-3 Specifications

General IconGeneral
BrandKBR
Modelmulticomp F144-MS-1V1C1TI6RO-3
CategoryController
LanguageEnglish

Related product manuals