EasyManua.ls Logo

Keba KeContact P20 - Page 16

Keba KeContact P20
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation KeContact P20
16 Installation manual, Version: 1.41 / Article no.: 90064
© KEBA 2012-2013
Installation requirements
Before beginning the installation, the installation guidelines must be observed.
Contact person on-site (for access to the mains disconnector in the electrical distribution
panel board).
The electrical connection (mains supply line) must be prepared.
Acclimation:
With a temperature difference of more than 15°C between transport and installation site,
the charging station should be acclimatized for at least an hour (preferably unopened).
The immediate opening of the charging station can lead to a formation of water in the in-
side and can cause damages when switching on the device. A possible damage could
also occur at a later time after installation.
Ideally, the charging station should be stored at the installation site for a few hours. If this
is not possible, the charging station should not be stored outside overnight or in a vehicle
at cold temperatures (<5°C).
Tool list to handle KC-P20
The following tools are required for the installation:
Flathead screwdriver for mains supply terminals (blade width 5.5 mm)
Flathead screwdriver for terminals X1/X2 (blade width 3.0 mm)
Phillips head screwdriver PH2
Mounting tools for cable glands M16 (width across flats 20mm) and M32 (width across
flats 36mm)
LSA+ insertion tool (optional)

Other manuals for Keba KeContact P20

Related product manuals