4.4.2 Connecting the mains supply line
Running the mains supply line
Running the mains supply line
(surface cable routing)
Run the mains supply line from ABOVE
as shown in the figure.
[M]… cable sheathing
Running the mains supply line
Running the mains supply line
(flush-type cable routing)
The power supply cable must be run as
shown through the feedthrough/double-
membrane seal [DMS].
Make sure that the double-membrane
seal fits cleanly against the cable
sheathing.