EasyManuals Logo

Keysight Technologies N5290/1A PNA Series User Manual

Keysight Technologies N5290/1A PNA Series
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #26 background imageLoading...
Page #26 background image
26 Installation Note N5222-90131
Description of the Upgrade
Installation Procedure for the Upgrade
-
W42 (N5222-20073) A21 HMA26.5 to A23 mixer brick
W12 (N5222-20068) Port 1 CPLR THRU to A29 port 1 coupler
W12 (N5222-20068) Port 1 CPLR THRU to A29 port 1 coupler
W123 (N5222-20123) A29 port 1 coupler to front-panel Port 1 A71 bias T
combiner
W24 (N5222-20069) Port 2 CPLR THRU to A32 port 2 coupler
W117 (N5222-20071) A32 port 2 coupler to front-panel Port 2 CPLR ARM
These cables must be saved - they will be reinstalled.
W4 (N5222-20040) W3 to A25 port 1 receiver coupler
W10 (N5222-20043) W9 to A24 port 2 receiver coupler
W13 (N5222-20005) A25 port 1 receiver coupler to A33 reference mixer
switch
W36 (N5222-20032) REF 1 RCVR R1 IN to A33 reference mixer switch
W35 (N5222-20033) A33 reference mixer switch to front-panel REF 1
SOURCE OUT
W30 (N5222-20091) (qty = 6) Front panel jumper
Step 13. Remove the A23 Mixer Brick Assembly
Remove the A23 mixer brick assembly from the PNA. For instructions, click the
Chapter 7 bookmark, “Removing and Replacing the A23 and A24 Mixer Bricks”
in the PDF Service Guide
1
.
Remove and save the cable guards for the front panel jumpers.
1. See “Downloading the Online PNA Service Guide” on page 8.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keysight Technologies N5290/1A PNA Series and is the answer not in the manual?

Keysight Technologies N5290/1A PNA Series Specifications

General IconGeneral
BrandKeysight Technologies
ModelN5290/1A PNA Series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals