1.3. Inspection
Upon receipt of the units at site, ensure the complete shipment against delivery note OR bill of
lading / bill of entry invoice / packing list and also inspect the units for any transit damage. If any
transit damage is found, report the shipping damage to the transporter and file the insurance
claim.
1.4. Handling and Lifting
Use spreader bars and suitable capacity crane & lifting cables. Refer Fig. 1.4a for details. Never
allow any part of the unit to fall during unloading or moving as this may result in serious
damage. Lifting rope hole on spreader bars shall be minimum 300mm more than the width of the
unit.
Refer lifting diagram instruction pasted on unit.
Fig 1.4a : Lifting diagram for scroll chiller
NOTE: PHYSICAL DAMAGE TO UNIT AFTER ACCEPTANCE IS NOT THE
RESPONSIBILITY OF KIRLOSKAR CHILLERS PRIVATE LIMITED.
CAUTION: SHARP EDGES AND IMPROPER BALANCING DURING HANDLING
AND LIFTING ARE POSSIBLE INJURY HAZARDS.
NOTE: DO THE UNIT HANDLING ONLY WITH QUALIFIED PERSONNEL WHO
ARE FAMILIAR AND EXPERIENCED WITH THIS TYPE OF EQUIPMENT.