KIRLOSKAR CHILLERS PRIVATE LIMITED
A Kirloskar Group Company IOM-KAC-ENG - Page 14
2.6. Installation of Flow Switch
For the safety of the unit, install flow-sensing instrument (shall be supplied at extra cost) in each
evaporator water / brine line. It may be a flow switch.
Flow switch installation: Mount individual flow switch in the leaving water line of the
evaporator and condenser. Refer Fig. 2.3a for flow switch installation.
2.7. Installation Check Report for KAC Chiller Units
Customer : ________________________________________________________
End User Consultant : __________________________________________________________
Unit model : ________________________________________________________
Unit serial # : _________________________________________________________
UNIT:
1. In case of transit damage, has it been attended completely?
2. Is there any damage during installation?
3. If any damage as per #2, has it been attended?
4. Whether unit is mounted as per recommendations?
5. Is there free space available to attend compressor(s)?
AIR-COOLED CONDENSERS:
1. Sufficient space allowed for cleaning and replacing tubes.
2. Air vent and Water drain valves are provided.
3. Flow switch is mounted in the leaving water line
4. Service valves are provided for de-scaling / servicing
EVAPORATOR / CHILLER:
1. Sufficient space allowed for air entry & service facilities?
2. Coil guard provided
POWER AND CONTROL PANEL:
Sufficient space allowed for accessing and servicing the panel.
MISCELLANEOUS:
Sufficient space allowed to access and attend refrigerant liquid line valves,
Electronic expansion valves and moisture & liquid flow indicator.