KONE Maintenance Method
MX10 / MX20 MCP Procedures - ASME A17.1-2013 / CSA B44-13
© 2014 KONE Corporation PSK8-604-MX10/MX20
All rights reserved.
102 (-) 2014-12-15
12) Back out of menu.
13) Return elevator to normal operation by putting switch 270 UP.
14) Register call to bottom terminal floor.
• Car will start.
15) After 77:U turns off, press and hold buffer test button.
• Elevator will run onto buffer. Overrides NTS.
16) Run elevator off buffer using following procedure:
• Reconnect the XME and XCT connectors on the ETSL board 1.
• Cycle controller power to reset ETSL faults, if any.
• Put elevator on machine room inspect by setting switch 270 DOWN.
• Temporarily jumper final limits, LCEADON2 XH1/1-5.
• Run elevator up above final limit.
• Remove temporary jumper from LCEADON2 XH1/1-5.
• Cycle controller power to clear any outstanding faults.
17) Remove all test weights.
18) Return elevator to contract speed:
• Put elevator on machine room inspection by setting switch 270 DOWN.
• Access menu 6-2 and set to contract speed:
- 350 FPM: 1.78 m/s
- 500 FPM: 2.54 m/s
- 700 FPM: 3.5 m/s
• Access menu 6-99 and select 1 to save.
• Remove tie down from counterweight safety.
• Verify buffer returns to full extension within 90 seconds
19) Run and test elevator.
20) Enable doors and hall calls.