EasyManua.ls Logo

Kverneland BE - Page 48

Default Icon
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Checklist
48
Daily maintenance
The following must be carried out:
Check the condition of the plough
Lubricate the plough
Regular maintenance
The following must be carried out:
Replace worn parts
Retighten bolts and nuts
Check
Is the automatic release system spring length L = 70 cm?
Is the tyre pressure correct?
Are the bodies oriented in the same way as each other?
Storage
The following must be carried out:
Lubricate all parts that come into direct contact with the soil.
Carry out the required maintenance - see »Regular maintenance«.