EasyManua.ls Logo

LACROIX City MILLENIUM - Preparation for Deployment

LACROIX City MILLENIUM
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
USER MANUAL
6
FR
3. PREPARATION FOR DEPLOYMENT
A. UNFOLDING THE LIGHT-HEAD:
B. FOLDING THE LIGHT-HEAD:
C. DEPLOYMENT OF TELESCOPIC EXTENSIONS:
1) Loosen the handle half a turn
2) Pull to release the locking bolt
3) Fold or unfold the extension
4) Tighten the handle
Perform this step on both handles
D. LOCKING/UNLOCKING THE HEAD FOLDING SYSTEM:
Once the extensions have been deployed, lock the tightening lever to ensure optimum stability for the light-head and
extensions.
Note: before folding the light-head over the box, ensure that the tightening lever is in the unlocked position.