Launch TLT245AT / TLT250AT(C) Two-post lift’s Installation manual
i
Table of contents
1. Precaution………………………………………………1
2.Lift Structure…………………………………………2
2.1 Diagram of lift structure…….……………………2
2.2 Principle of the equipment......…...…...………5
3 Tools for installation and adjustment………………5
4. Unpacking…………………………………………….6
5. Installation…………….………………………………6
5.1 Important notice……………………………………6
5.2 Installation Procedure…………………………………6
5.2.1 Selecting installation site …………………………...6
5.2.2 Base plate layout……………………………………...7
5.2.3 Install the powerside column………………………….8
5.2.4 Install the top beam…….………………………………9
5.2.5 Install the offside column………………………………10
5.2.6 Install and adjust the balancing steel cables………10
5.2.7 Install the power unit………………….…..………..…11
5.2.8 Connecting the power supply…………………………11
5.2.9 lock release cable installation………………………..12
5.2.10 Connecting the hydraulic lines……………………..12
5.2.11 Install the swing arm and guardrail………………..13
6. Lift Adjustment……….……………………………….14
6.1 Preparation before adjustment……………………14
6.2 Adjustment procedure…………………………………14
7. List of the lift components………………………15
7.1 TLT245AT components list………………………………15
7.2 TLT250AT(C) components list…………………………22
Diagram of the electrical system……………………....29
Diagram of the hydraulic system……………………....30
AppendixTransportation Guide…….……....31