5
Comprehensive List of phx42 Skills
Normal Operations
1. Clean it
2. Power it ON/OFF
3. Know the end-of-day sleep mode procedure
4. Change Filter
5. Ignite it
6. Connect and Disconnect to the 42App or your Monitoring Software
7. Fill Hydrogen
8. Confirm that the Hydrogen Cap is in place
9. Attach unit to Charger
10. Confirm that the Charging Port Cover and Tether are in place
11. Take a PPM Reading
12. Initiate a self-check using Cal5.0 OR the 42App
13. Block the Probe tip during the self-check process
14. Calibrate using Cal5.0 OR Manually Calibrate
15. Report issues to LDARtools using the Customer Portal (if there is no Level 1
Technician on-site)
16. Perform the Probe Integrity Inspection (weekly)
Level 1 Certified Operations
1. Verify that you have most current version of phx42 Manual
2. Receive it after shipping
3. Initiate the Prepare-to-Ship Wizard
4. Update the 42App firmware
5. Set a PPM Alarm
6. Set a Response Factor other than 1
7. Troubleshoot issue with LDARtools Customer Support
8. Repair a Probe
9. Remove broken probe tip filter
10. Replace Scrubber filter medium*
11. Replace the Glow Disk*
12. Replace the Battery*
13. Replace a Pump*
14. Collect Inspection records with the Basic Survey Mode
*Only after reporting an issue on the customer support portal.