Scope of Delivery
One set of pipe cutting/beveling machine should include
the following item. Please inform the manufacturer or
forwarder of any missing parts or transportation
damage immediately.
1. One pipe cutting/beveling machine
2. One base plate
3. Three blade
4. One ring spanner(SW22)
5. Two Hexagon socket head wrenches
6. One Tube of LEFON saw blade lubricant
7. One operation Manual
8. One Spare parts List
Installation
Step 1
: Install the base plate
Step 2
: Mark and prepare to perforate
Step 3: Drill 13 mm holes
Step 4: Install the cutting machine on base plate (follow
the procedure in next page)