Figure 63. RAID adapter installation
Step 6. Firmly press on the foam to seat the RAID adapter into the connector.
Figure 64. RAID adapter installation
After you install the RAID adapter, complete the following steps:
1. Install any removed storage drives and drive bay fillers (see “Install a 2.5-inch hot-swap drive” on page
27).
Note: Install storage drives in the same bay locations as from which they were removed.
2. Install the compute node cover (see “Install the compute node cover” on page 43 ).
3. Install the compute node into the chassis (see “Install the compute node in the chassis” on page 25 ).
4. Power on the compute node.
5. Configure the RAID array.