Step 1. If there is a power-supply-bay filler installed, remove it.
Important: To ensure proper cooling during normal server operation, both of the power supply
bays must be occupied. This means that each bay must have a power supply installed; or one has
a power supply installed and the other has a power-supply filler installed.
Figure 57. Hot-swap power supply filler removal
Step 2. Slide the new hot-swap power supply into the bay until it snaps into position.
Figure 58. Hot-swap power supply installation
Install a front fan
Use this information to install a front fan.
“Read the
installation
Guidelines” on
page 58
“Power off
the server for
this task” on
page 109
“ATTENTION:
Static Sensitive Device
Ground package before opening”
on page 59