EasyManua.ls Logo

LevelOne ProCon GSW-2476 - Equipment Checklist and Mounting

LevelOne ProCon GSW-2476
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
E
QUIPMENT
C
HECKLIST
3-3
Equipment Checklist
After unpacking GSW-2476 unit, check the contents to be sure you have
received all the components. Then, before beginning the installation, be
sure you have all other necessary installation equipment.
Package Contents
• GSW-2476
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for
attaching the brackets to the switch
•Power cord
• CD User Guide
Optional Rack-Mounting Equipment
If you plan to rack-mount the switches, be sure to have the following
equipment available:
• Four mounting screws for each device you plan to install in a rack—these
are not included
•A screwdriver
Mounting
GSW-2476 can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
Rack Mounting
Before rack mounting the switch, pay particular attention to the following
factors:

Table of Contents