EasyManua.ls Logo

Lippert Components ground control 3.0 - Preventive Maintenance

Lippert Components ground control 3.0
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rev: 03.02.2017
Page 17
Ground Control 3.0 with OneControl
Preventive Maintenance
1. For optimum performance, the system requires full battery current and voltage. The battery must be
maintained at full capacity.
2. Check the terminals and other connections at the battery, the controller, and the jacks for corrosion,
and loose or damaged connections.
3. Remove dirt and road debris from jacks as needed.
4. If jacks are down for extended periods, it is recommended to spray exposed leveling jack rods with a
silicone lubricant every three months for protection. If the trailer is located in a salty environment, it is
recommended to spray the rods every four to six weeks.

Other manuals for Lippert Components ground control 3.0