SOLERA
®
POWER AWNING - INSTALL INSTRUCTIONS
TI-144
AWNINGS
Securing The Fabric
1. Extend and retract the awning several times to ensure that the fabric is square on the roll tube.
2. Secure the fabric in the awning rail by installing a #6 x ½” hex head screw through the fabric cord and fabric
1” inside the edge of the fabric on both sides (Fig. 5).
NOTE: Seal all wall penetrations to protect against water intrusion (Fig. 6).
NOTE: Solera Awnings 21' and under DO NOT require a center support or cradle.
Battery,
Power Source
or Converter
Black
Red
AWNING
Ground
Power
Red
Black
Manual
Rocker
Switch
Wiring Diagram
NOTE: Solera® Awnings are equipped with a 6A Auto Reset breaker supplied by LCI.
NOTE: The motor comes stock with internal thermal protection. LCI recommends that the awning be on a 15A
circuit.
NOTE: All wire to be 14 AWG or larger as necessary to provide 12V minimum at all times at the connection to the
LCI-supplied power cable.
Fig. 5 Fig. 6
Fig. 7
As a supplier of components to the RV industry, safety, education and customer satisfaction are our primary concerns.