EasyManua.ls Logo

LIVOLTEK Hyper 5000 - Page 38

Default Icon
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38
Step 2: Connecting EPS Connector
Unscrew the cap on the EPS port.
Insert the EPS cable into the EPS port on the
inverter until there is a “Click” sound.
6.4.2 Declaration for EPS Loads
The purpose of the EPS Loads Function is to enable certain house circuits to remain on
in the event of a power failure.
Make sure that the combined power required for all devices connected to this output does
not exceed the power rating of the inverter.

Other manuals for LIVOLTEK Hyper 5000

Related product manuals