EasyManua.ls Logo

LSIS XEC-DN60SU

LSIS XEC-DN60SU
315 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5 Positioning Instructions
5 - 31
(b) Operation of the Program
SSS instruction is executed if there is the rising edge of M0001, which was used as the speed
synchronous instruction signal. Since the second operand is 1(axis Y), axis Y becomes the
auxiliary axis, and because the fifth operand is 0(axis X), the main axis is axis X.
If there is the rising edge of M0002, which is the indirect starting instruction signal of the main axis,
No. 1 step of axis X is indirectly started.
When the main axis is started, axis Y is started at the synchronous ratio speed of 100.00[%] set in
the third operand of SSS instruction, and is synchronized to the main axis with the delay time of
10[ms] set in the fourth operand for operation.

Table of Contents

Related product manuals