45
English
• Units: Antenna height unit (meters, US feet or Int feet)
• Height Type: Slant or Vertical.
• Recording Interval: Time in seconds between any two
consecutive acquisitions of GPS data. Make sure the
same recording interval is used at the base and in the
rover.
• Control Point check box: If you check this box, you will
be able, later on, to use the point associated with this
Site ID as a control point.
Data Collection
7. Tap the Log button at the bottom of the screen.
The Static Survey screen opens providing information on
the status of your survey during the data collection period.
Information provided here will help you determine when
enough data has been collected.
VerticalSlant