Commissioning
9 Commissioning
9.1 Safety during commissioning
Qualification of personnel
Magnetic MHTM™ FlowMotion® service expert
ä Page 12, chapter 2.3.2.
Personal protective equipment
Wear the following personal protective equipment:
Work clothes
Protective gloves
Safety shoes.
9.2 Putting the pedestrian gate into operation
IMPORTANT!
Commissioning must be carried out in accordance with the test
book. See separate document "Test Book mWing (Doc.ID:
5837,0011)".
9.3 Switching the pedestrian gate on and off
NOTICE
Fast restart!
Switching the pedestrian gate on again too fast can lead to dam-
age to the device!
Wait for at least 10 seconds after switching off the pedestrian
gate before you switch the mains power on again.