EasyManua.ls Logo

Magnetic MHTM FlowMotion mWing - Final Assembly and Verification

Default Icon
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
53
mWing
Installation and assembly
7.8 Assembly of the mWing
Prerequisites
The pedestrian gate is mounted on the floor.
Covers, side parts, and lower strips are not assembled on delivery.
The swing doors are available in different heights. Swing doors in the standard
height are installed for delivery. Higher swing doors are delivered separately.
Mag10025
Fig. 23: Pedestrian gate in the delivery status

Table of Contents