EasyManuals Logo

Mahindra YUVRAJ 215 User Manual

Mahindra YUVRAJ 215
85 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #64 background imageLoading...
Page #64 background image
64
f. Raise the pressure to 125-140 kg/cm
2
. Do
not raise the pressure sufficiently to blow
the relief valve. Wait for 2-3 minutes and
observe plugs and ports for leakage. If any
of these plugs are leaky tighten it or replace
if required.
g. IF oil is coming out from coupling pressure
pipe, or port (9-3) ‘check valve’ is leaky,
remove check valve and observe sear for
any damage, observe ‘O’ ring for any cut
and deformation etc. Before reassembling,
change ‘O’ ring on seat.
h. After reassembling, observe the pressure
guage, if the pressure is coming down, and
if oil is leaking from clearance between
main spool and sleeve is more than (0.010-
0.012) mm. Replace the spool with the
spool of bigger diameter and do necessary
lapping.
Hy-tec Hydraulics

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mahindra YUVRAJ 215 and is the answer not in the manual?

Mahindra YUVRAJ 215 Specifications

General IconGeneral
Engine Power15 HP
TransmissionSliding mesh
Number of Gears6 Forward + 3 Reverse
BrakesOil immersed brakes
PTO Power12 HP
Hydraulic Lifting Capacity500 kg
Number of Cylinders1
Rated Engine Speed2300 RPM
Wheel Base1490 mm
Weight780 kg
Engine TypeSingle Cylinder, Water Cooled
Fuel Tank Capacity19 Litres
SteeringMechanical

Related product manuals