EasyManua.ls Logo

Mahindra YUVRAJ 215 - Before Assembly

Mahindra YUVRAJ 215
85 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
83 Remove the 6 nos bolts of the flywheel
housing & remove the flywheel housing.
84 Remove the 4 nos bolts of the rear retainer
(17mm).
85 Use the two bolts as a puller & remove the
retainer.
86 Remove the crankshaft
87 Remove the thrust washer.
Flywheel
Housing
Crankshaft
Main Bearing
Retainer
Puller
Bolts
Puller
Bolts
Crankshaft
Thrust
Washer
Engine
Before Assembly ensure that
1 Use new gaskets, ‘o’ rings, Oil Seals and
fasteners.
2 All bearings must be cleaned & lubricated.
3 All moving parts must be smeared with
lubricants.
4 Smear oil on oil seal lip before fitment.
5 Use recommended Special Service tools.
Assembly :
Assembly is reverse of dismantling sequence.
Some of the important adjustments that needs
to be done are as follows :

Table of Contents

Related product manuals