Page 75Version 2023-06-15 Fire damper - FDMR
TPM 140/19
EIS 90
1 FDMR
2 Installation frame - apply HILTI CFS-S ACR mastic at the entire area and
glue it to the fire separating construction
3 Fill the gaps with glue PROMAT K84
4 Duct
5 Clamp with threaded rod → see pages 87 to 89
6 Solid wall construction
7 Holes for fixing the frame with threaded rods or steel anchors (frame
fixing material not included)
≥ 100
Ø
D
110
X
Ø
D
Ø
D+10
+3
(installation opening)
X = ØD+120 for dampers ØD 100-200 mm
X = ØD+167 for dampers ØD 225-800 mm
4 x Ø12
■ For connection of following duct → see page 90
■ Installation frame can be installed on the damper or delivered separately
■ Installation procedure of the installation frame for FDMR → see manual
In solid wall construction - installation frame R5