LUBRICATE Shafts, hubs and cylinder rings
t
IMPORTANT
t
Always secure the raised arms with a suitable lifting device.
- Switch the platform on.
- Perform the appropriate main arm, secondary arm, jib and basket tilt movements to access the various lubricators. Secure
the raised arms with a suitable lifting device.
- Remove the caps of the lubrication connectors.
- Inject lubricant into each lubrication connector, eLUBRICANTS.
- Refit the lubrication connector caps.
- Tilt the basket up or down until the basket floor is horizontal. Ensure that the basket cannot hit the floor.
- Fully lower the main arm, the secondary arm and the jib.
KEY
SHAFT
HUB
CYLINDER RING
3 - 27
x2
x2
647536 (26/11/2020)
150 AETJ/AETJ 3D - 150 AETJ C/AETJ C 3D - 170 AETJ L