EasyManuals Logo

Manitowoc Grove RT530E-2 Service And Maintenance Manual

Manitowoc Grove RT530E-2
314 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #121 background imageLoading...
Page #121 background image
Published 4-22-15, Control # 556-00 3-11
RT530E-2 SERVICE MANUAL ELECTRIC SYSTEM
GROVE
3
8. Install the left side cover (8) on the steering column.
9. Secure the switch cover (6) to the left and right side
covers (8, 9) using six screws (14).
10. Secure the left and right side covers (8, 9) together using
four screws (13).
11. Install the steering wheel (2); torque the securing nut to
40 Nm ±5 (30 lb-ft ±4).
12. Install the steering wheel cap (1).
13. Install the lever (12) and spacer that locks/unlocks the
steering column tilt/telescope function.
14. Pull the rubber boot (11) up and over the bottom of the
left and right side covers (8, 9).
15. Turn the battery disconnect switch to the ON position.
Check
1. Operate the turn signal lever or transmission shift lever
per the Operator’s Manual. Verify each of its functions
work.
2. As needed, troubleshoot further any system or circuit
malfunction not corrected by repair or replacement of
the switch or associated wiring.
FIGURE 3-6
8494
9
10
13
14
11
12
1
2
3
4
5
6
7
8
13
14
14
12
Reference Only

Table of Contents

Other manuals for Manitowoc Grove RT530E-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove RT530E-2 and is the answer not in the manual?

Manitowoc Grove RT530E-2 Specifications

General IconGeneral
BrandManitowoc
ModelGrove RT530E-2
CategoryConstruction Equipment
LanguageEnglish

Related product manuals